In-Water Surveys: What Owners Can And Cannot Avoid

How an in-water survey is planned and run during a commercial port call: class coordination, inspection scope, safety isolations, and where the method reaches its limits.

Duration
11 min
Published
08 May 2026

01Listen

Episode player

Below the Surface cover artwork for the episode “In-Water Surveys: What Owners Can And Cannot Avoid”

Episode audio· 11 min

0:0011 min

Ready to play. Audio never starts automatically.

Chapters

02Takeaways

Key points from this episode

  • An in-water survey can satisfy some class intermediate or renewal requirements during a cargo port call, subject to the society's acceptance.
  • Propulsion, thrusters and sea suctions are isolated and locked out before any diver enters the water.
  • Shaft withdrawal, major steel renewal and full coating renewal remain dock work.
  • Survey documentation and any non-destructive testing results are what the class society and technical manager use to decide whether a drydocking is actually required.

03Structure

Chapters and editorial team

Chapters
  • 00:00Scope And Context Of In-Water Surveys
  • 01:27Preparation And Operational Planning
  • 02:50Coordination With Stakeholders
  • 04:15Methods, Tooling, And Inspection Equipment
  • 05:40Structural And Mechanical Inspection Scope Afloat
  • 06:59Limitations Of Afloat Assessment And Required Dock Work
  • 08:22Risk Management And Diving Safety
  • 09:46Documentation, Class Acceptance, And Decision-Making
Speakers
  • USG technical editors Editorial and technical review

Contact

Discuss a project with the group

Send us the structure, vessel or incident and we will confirm the right operating company, method and working window.

Emergency response · 24/7 desk

Vessel incidents, obstructions, damage and urgent underwater repair. Mobilisation depends on incident, location and resources — we do not publish a guaranteed response time.

+32 472 67 44 21Emergency procedure